Fracturing and coiled-tubing equipment in winter conditions

Well Intervention

Fracturing & Coiled Tubing

Acidizing, fracturing and coiled-tubing services configured for the specific well condition and production objective.

Back to solutions

The challenge

From field question to operating result

Reliable delivery depends on matching the treatment design to the operating window, well integrity and surface-equipment configuration.

01

Service scope

  • Fracturing and acidizing design
  • Coiled-tubing operations
  • Wellbore treatment and job coordination
  • Field monitoring and technical support

02

Applications

  • Reservoir stimulation
  • Wellbore cleanout and treatment
  • Workover support
  • Well restart and production recovery